Upload a photo or job notes — ForgeSpec outputs jurisdiction-specific, code-compliant HVAC and plumbing documents in seconds. No lookups, no resubmittals.
No credit card required · First 3 specs free
Rooftop RTU Install — Spec Ready
NFPA 90A · IMC 2021 · Cook County AHJ
4 min
Generation time
99%
First-pass rate
12K+
Docs generated
Watch ForgeSpec read your job inputs, cross-reference jurisdiction codes, and output a permit-ready document.
Drop job photo or paste notes
Rooftop RTU install · ZIP 60601 · Cook County, IL
Trusted by trade contractors nationwide
4 min
Average spec generation time
99%
First-pass permit approval rate
12K+
Documents generated
Capabilities
From job input to permit-ready document — no spec writers, no code books, no resubmittals.
Snap a job site photo or paste your notes — ForgeSpec reads the inputs and outputs a fully formatted, code-compliant spec document in under 60 seconds.
Automatically applies the correct code amendments for your county, city, and AHJ. No manual lookups, no guessing.
NFPA, IPC, IMC, UPC, and thousands of local amendments — always current, always accurate.
Every document is formatted exactly the way AHJs expect. Hand it directly to the inspector — no rewrites, no resubmittals, no failed inspections.
Workflow
Drop photos, voice notes, or a quick description of your job scope and location.
ForgeSpec applies the correct codes for your jurisdiction and produces a complete, formatted document.
Hand the spec directly to the AHJ. No rewrites, no resubmittals, no surprise rejections.
5-ton rooftop RTU install, Cook County IL, commercial permit, gas connection NFPA 54
Enterprise-grade security for every contractor
AES-256 encryption
in transit & at rest
SOC 2 Type II
compliant infrastructure
Your data is yours
never sold or used for AI training
GDPR compliant
privacy by design
From the Field
“Used to spend 3 hours writing specs per job. Now it takes 4 minutes. No more failed inspections.”
Dave Kowalski
Owner · Master HVAC
“Our permit approval rate went to nearly 100% after switching to ForgeSpec. The code compliance is rock solid.”
Maria Santos
Project Manager
“22 years in this trade and this is the first tool that actually understands what an inspector wants to see.”
Rick Tanner
Master Plumber · License #MP-7741
Mobile Ready
Snap a photo on the roof, type a quick scope description on your truck, and ForgeSpec delivers a complete, permit-ready document before you leave the job site.
8
This month
100%
Pass rate
Rooftop RTU Install
IMC 2021
Gas Line — Unit 4B
NFPA 54
Drain Rough-In #7
IPC 2021
Pricing
No per-document fees. No setup costs. Pick the plan that fits your crew and scale as you grow.
Perfect for solo contractors getting started with AI-powered specs.
For growing contractors who need faster turnaround and more volume.
For multi-crew operations that need volume, collaboration, and API access.
All plans include a 14-day free trial. No credit card required to start.
Generate your first compliant spec in under 5 minutes. Free to start.
Generate Your First Spec Free →